-
Notifications
You must be signed in to change notification settings - Fork 14
2017 11 02 team meeting agenda
Participation at this meeting is by invitation only.
Date: Nov 2, 2017, 9:00 to 10:30 Pacific Time
Location: LBNL, building 90, room 1099. Attendance can be by web conference, but if anyone likes to join in person, please send email to Shaylah (ssrigmaiden@lbl.gov) by Monday 10/30 COB. Please let her know your citizenship and whether you will arrive by bus or need parking.
Slides will be posted at https://github.com/lbl-srg/obc/tree/master/meetings/2017-11-02-team
Dial-in information: https://lbnl.zoom.us/j/6614042296
Or iPhone one-tap (US Toll): +14086380968,6614042296# or +16465588656,6614042296#
Or Telephone:
Dial: +1 408 638 0968 (US Toll) or +1 646 558 8656 (US Toll)
Meeting ID: 661 404 2296
International numbers: https://lbnl.zoom.us/zoomconference?m=_h5BuJ686mPy3rWEyKf4NROxLaeOV5J8
Or an H.323/SIP room system:
H.323:
162.255.37.11 (US West)
162.255.36.11 (US East)
221.122.88.195 (China)
115.114.131.7 (India)
213.19.144.110 (EMEA)
Meeting ID: 661 404 2296
SIP: 6614042296@zoomcrc.com
- Structure of Guideline 36 implementation. See slides. 9:00-9:10 (Jianjun & Milica)
- Discussion of case study. See pdf report. 9:10-9:55. (Michael)
- Updates to CDL. See slides. 9:55-10:00 (Michael)
- Upcoming deadlines. See below. 10:00-10:10 (Michael)
-
M3.1 By Q5, demonstrate with an emulated control response that the controls verification can signal satisfied, undecided, and violated test results.
-
M3.2 By Q6, demonstrate with an actual measured control response that the controls verification can signal satisfied, undecided, and violated test results.
-
Go/no-go 2: By Q6, successful comparison of the energy and comfort performance of two ASHRAE GPC 36 control sequences with a Modelica HVAC and control model linked to EnergyPlus. The technical criteria are that the energy performance of two GPC 36 sequences can be compared in a closed-loop simulation and that a first version of its CDL representation can be shown.
-
Task 3.3: By Q7, release first version of the controls verification test module.
-
Task 3.4: By Q8, release first version of the GUI.
-
Task 4: By Q8, write case study report as above, but for primary HVAC system.
-
Task 5: By Q8, write first version of commercialization and market transformation plan with the goal to show value and obtain commitment from large owners and design firms for the process.
-
Next steps (Michael) 10:10-10:25
- CDL export by Q6
- Library of verification tests. See slides. (Required for M3.1 and M3.2, some can be used from Guideline 36. Need prioritization.)
- Sequences for primary systems (to be aligned for next case study)
-
Other feedback/discussion 10:25-10:30
xxx
xxx